Layots Logo
Cloud Computing

GPU Server Quotation in India: What to Include in Your BOQ

Turn a GPU enquiry into a comparable server quotation with workload targets, deployment constraints and acceptance tests.

Layots Editor
Layots Technologies
Share
GPU Server Quotation in India: What to Include in Your BOQ

Turn a GPU enquiry into a comparable server quotation with workload targets, deployment constraints and acceptance tests.

Start with the workload

For AI inference, share the model family, expected input lengths, peak requests, concurrency and response-time target. For training, share dataset size, framework, checkpoint frequency and target time to complete a run. For engineering simulation, supply a representative case and the solver version.

Specify the complete system

Ask each bidder to itemise GPU memory and count, CPU and RAM, usable storage, network links, cooling, rack space, power draw and software or support costs. Confirm which components are included in the base quote and which are optional.

Agree on the acceptance test

Use the same representative workload for every proposal. Record throughput, latency and peak memory under sustained load. Include the delivery location, deployment window and required support coverage in the BOQ.

What to send with your GPU server BOQ

A useful BOQ starts with one real workload and a measurable target. If you need to serve an internal knowledge assistant, describe the model, the typical and maximum prompt lengths, the number of simultaneous users and the response time they can tolerate. If your team fine-tunes models overnight, include the framework, precision, model and dataset sizes, checkpointing requirements and the time window available for a run. These inputs help suppliers explain how they arrived at their recommendation.

Document the deployment environment as well. Include the site, rack space, usable power and cooling capacity, existing network speeds, and any restrictions on where data can be stored. If you have an existing cluster, describe how the new server must connect to storage, monitoring and identity systems. Ask bidders to list their assumptions where information is still missing.

How to compare two GPU server quotations

  • GPU configuration: Ask for the exact GPU model, count and memory per card. If the workload uses multiple GPUs, ask how the application distributes work and how the proposed interconnect supports it.

  • Server configuration: Ask for the CPU model, system RAM, storage layout and usable capacity. Check whether quoted storage is for the operating system, temporary processing, checkpoints or long-term data.

  • Deployment costs: Itemise rack installation, cabling, networking, software subscriptions and any work required to connect the server to the existing environment.

  • Support: Ask who handles installation, hardware incidents and escalation. Request the support period, service hours, response commitments and coverage for replacement parts in writing.

  • Delivery: Ask for estimated lead time, quote validity and any dependencies that could affect the installation date. Confirm when the acceptance period begins.
  • Where one vendor proposes a smaller system and another adds capacity for growth, ask both to show the workload and utilisation assumptions behind their proposal. Use the same contract period and support scope when comparing costs.

    Worked example for an internal AI assistant

    Suppose a team expects 40 employees to use an assistant, with eight active conversations at peak. Give each bidder the same test model and representative set of short and long prompts. Ask them to record time to first response, generation throughput, peak GPU memory and failed requests at the expected concurrency. Repeat the test with the longest realistic inputs and compare the results with the agreed response targets.

    Check what happens when the request rate exceeds the planned peak. The team may need queuing, a second instance or tighter limits on input length. A short pilot makes those trade-offs visible before the hardware configuration is finalised.

    What should the acceptance test cover?

    Name the person who will validate the workload and agree on pass criteria before the purchase order. Include a sustained test, hardware inventory verification, monitoring checks and a handover of support contacts. Ask for a record of the software versions and configuration used during testing so the IT team can reproduce the results after deployment.

    Common questions

    Can I request a quote before choosing a GPU model? Yes. Provide the workload, expected concurrency, deployment location and success criteria, and ask bidders to explain their proposed configuration.

    Can two smaller GPUs replace one larger GPU? It depends on how the model and software divide work and memory across devices. Ask for a demonstration using your actual workload before treating the configurations as equivalent.

    Request a GPU BOQ review

    Share your workload, project location and deployment window. Layots can review the requirements with your team before you request quotations.

    Get an IT assessment

    Ready to transform your IT?

    Speak with a Layots enterprise architect. Assessment, no obligation.

    Request IT Assessment →
    Free assessment

    Talk to Our Specialists

    Found this useful? Our architects can apply the same thinking to your environment.

    • A solution architect reviews your requirement
    • We respond, usually within one business day
    • You get a practical, costed recommendation

    Prefer to talk now?

    No obligation. By submitting, you agree to our Privacy Policy. We never sell your information.